
Hardscape
Ridgeline Terraces
- Location
- Powell, OH
- Scope
- Three-tier retaining system, 62 linear feet of stone stairs
- Timeline
- 11 weeks — Fall 2024
- Materials
- Dry-stack sandstone, geogrid reinforcement, bluestone treads
The Project
A twenty-two foot grade change was eroding into the neighboring property. We engineered three reinforced tiers with geogrid and a full drainage chimney behind each face.
The stair run was laid out to hold a consistent seven-inch riser across the entire descent, which required re-cutting eleven treads on site.
Gallery
Let's build something that outlasts us both.
Consultations begin with a walk of your property and an honest conversation about scope, budget, and timing.